Driveway
June 1. 2020
Work commenced on Wednesday 27th May to completely renew the driveway with 'calcaire' stone chippings.
The old top layer has been removed, hardcore layer and 'wacked'. A drain has been installed to run water away from bottom of slope.
Membrane has been laid and top layer of stone is starting to be laid.
The 'calcaire' matches the colour of the stone that the gîte is built from.